- Automobiles & Motorcycles
- Beauty & Personal Care
- Business Services
- Chemicals
- Construction & Real Estate
- Consumer Electronics
- Electrical Equipment & Supplies
- Electronic Components & Supplies
- Energy
- Environment
- Excess Inventory
- Fashion Accessories
- Food & Beverage
- Furniture
- Gifts & Crafts
- Hardware
- Health & Medical
- Home & Garden
- Home Appliances
- Lights & Lighting
- Luggage, Bags & Cases
- Machinery
- Measurement & Analysis Instruments
- Mechanical Parts & Fabrication Services
- Minerals & Metallurgy
- Office & School Supplies
- Packaging & Printing
- Rubber & Plastics
- Security & Protection
- Service Equipment
- Shoes & Accessories
- Sports & Entertainment
- Telecommunications
- Textiles & Leather Products
- Timepieces, Jewelry, Eyewear
- Tools
- Toys & Hobbies
- Transportation
5 Things to Know Before Buying Split Sets Underground Mining
Underground Mining Method Example - 911Metallurgist
Owing to two large falls of ground which resulted in serious accidents occurring towards the end of , it became evident that the 'open chamber' system then muse was unsuitable for the conditions existing in the Mount Morgan mine. It will be admitted that in all mining operations the first consideration is the economy of the system adopted, combined with its safety and ability to give the desired output. A sectional system with square sets has been introduced into the mine, in which due attention has been paid to these factors. In this paper a brief description of this system will be given. An outline of those previously used will be included, as it is necessary to understand the conditions which existed in the mine at the initiation of the sectional system. Outside the actual mining methods employed, various points that might prove of interest will be touched on.
You will get efficient and thoughtful service from TRM.
The square set system of mining has been in use throughout the stopes in the gold ore in the upper levels of the mine since underground operations were started in Mount Morgan. In the oxidized zone the ore was of a friable nature, and in some cases running ground was encountered. In the lower levels the ground became heavier, and although the stopes were for the most part long, wide, high, and irregular, and not sectionalized, no difficulty was experienced in winning the ore, and no accident of a serious nature, due to falls of ground, occurred while mining with this system. It was then the practice to cany up the stopes to the level above, a distance of 60 to 80 ft., without filling, and only to fill after beating through. Reliance was placed on the set timbers as a support to the back.
The following examples demonstrate the weight these timbers are capable of carrying. In one case a detached block of ore 60 ft. by 20 ft., weighing approximately tons, and in another a block 20 ft. by 40 ft,, weighing tons, rested on the timbers for some time. In the former case the stope was filled to within one floor of the back, and in the latter to within three.
The gold ore, for the greater part, is situated on the east side of the Andesite dyke, which is a vertical dyke with an average thickness of 15 ft. (Fig. 1.)
Increasing copper values in the sulphide ore led the management to suspect the presence of copper ore at a lower level, and it was determined to prospect for this. Diamond-drilling located to the north-west, of the Andesite dyke a large amount of copper-gold ore (called in this paper copper ore). It was then decided to start mining operations on this, and a cheaper method than that already in use was sought for. The different systems of mining wide lodes in various parts of the world were examined, and the open chamber system, was adopted.
The South dyke, a vertical dyke of an average thickness of 18 ft., runs throughout that portion of the copper ore at present being worked, and is cut off at a fault about 400 ft. north-west of the Andesite dyke (Fig. 1). Levels were opened out at intervals of 100 ft. from the 650-ft. level downwards, and drives were laid off parallel to the strike of the South dyke on either side, those nearest being 30 ft. from it, and the others 60 ft. apart. To start the chambers, sill cuts were opened out from these drives to a width of 60 ft. and to a height of 9 to 10 ft., and extending from the Andesite dyke to the fault. As these were being taken out it was thought advisable to leave pillars of ore as supports to the backs, where the presence of dykes indicated weakness, and these were to be removed as the second cut proceeded. The South dyke was to
act as a support, and, as it ran parallel to the length of the chambers, could be left in situ. Poles 7 in. to 10 in. in diam., spaced 2-ft. 3-in. centres, were laid across the chambers, and close-slabbed for the purpose of forming a picking-up floor, as shown in Fig. 4.
A second cut was then started, and when this had advanced at least 30 ft., bulkheads were erected along the dead-wall to within 5 ft. of the back also 10 ft. apart along the centre of the chamber. To form the main ore-way the latter were covered with ironbark logs, 9-in. to 12-in. diam., spaced 2-ft. centres, and these slabbed with 9-in. x 2-in. timber. The bulkheads followed the second cut and could only be built to within 12 ft. of the broken ore on the floor. This distance had then to be increased to 20 ft. before the permanent bulkheads could be continued, as the longitudinal poles were in lengths of 18 ft. The stope was then filled to the level of the dead-wall bulkheads from winzes spaced about 60 ft. along the chamber, the foot of the rill of the filling being at the end of the bulkheads nearest the face. Temporary pig-styes were erected on sollars on the filling to support the back, also on the heap of broken ore and under the first cut.
The third cut was taken out in a similar manner, with the exception that now only the dead-wall bulkheads were advanced. Ore passes and ladderways were left at intervals along the ore-ways, and were built up as the filling increased in height.
After working for about three years this system had to be abandoned, owing to the increasing ' heavy ' nature of the ground. It was found that the presence of vertical and flat dykes, heads, and ' mundic seams ' rendered it unsuitable, as too much ground had to be left unsupported in order to get the longitudinal bulk-heads in position. Figs. 1, 2, and 3 give an example of the way in which the ore-body is intersected with dykes and heads, and also show the danger of undercutting without support to any extent.
An exhaustive examination of the mine was made by experts, and several schemes suggested for its safe and economic working. After due consideration it was decided to adopt the sectional system, with square sets, proposed by Mr. James White, one of the writers. In its ideal form the system is as follows :'The ore-body is worked out in sections 30 ft. along and 60 ft. across the stope, leaving temporary pillars, 20 ft. wide, as shown in Plate LXIV. The South dyke is left in irrespective of its thickness. Winzes are spaced 60 ft. along the main drives, and are opened out to four sets, two sets being used in each section'one set as a ladderway, and the others as mullock or ore-passes. Every second section is started from a winze, and opened out, as shown in Plate LXIV., A and D, while the other sections are started from three sets, which are left open from level to level in the previous section. This is done for the purpose of saving winzing.
The stopes in each section across the ore-body are under one another on the various levels, and are, advanced together as nearly as possible.
In Plate LXIV., A, two sections are shown worked out, and the fourth section has been commenced from the winze while the third section is being completed. In Plate LXIV., B, the method of advancement of stopes on different levels is shown.
Filling is either supplied from a winze, or from one of the three sets left open in the previous section, and is carried up with the stope as shown, a row of sets adjoining the pillar on the sill-floor being left open for a roadway for the purpose of attacking it. (Plate LXIV., F.)
Plate LXIV., E, which is a cross-section taken out through the winze in the first section, which is completed, shows the advancement of the pillars on the different levels, and the method of stoping. The first 60 ft. x 30 ft. sections of the stope are completed before stoping is commenced on the intervening pillar, which is worked out on the top level before stoping is commenced on the level below, and so on. (Plate LXIV., C.)
Fig. 5 shows in detail the method of timbering a pillar-section between two stopes that have been worked out. The first pillar-section, 30 ft. x 20 ft., is started from the open roadway left in the adjoining completed stope. A mullock-pass is carried forward with the stope, the roadway being filled as the stope advances. A set is left open at the end of each section adjoining the open roadway for a man-way from level to level when commencing the second pillar-section.
The following is the method of picking up the sill-floor of a stope :'When a stope in one section has been worked to a height
of 62 ft. above the level below, it is bulked if necessary for a width of 25 ft.; the remaining 35 ft. is then worked out, and the level above picked up. The bulked portion of the stope is then cut out. The timbering alongside the South dyke is shown reinforced with filled bulks built in the sets, and also the last 30 ft. alongside the pillar, but in both cases this need only be done if the ground is of such a nature as to require it.
It was found necessary to modify this scheme so as to adapt it to the work previously done in the mine. It was decided to start the sections in the north-west end of the copper ore in the vicinity of the fault, and advance them towards the Andesite dyke, and at the same time towards the main inclined shaft, through which the ore is raised, so that trucking ore and filling should, as far as possible, be on solid ground, and not over depleted stopes, this being also the most favourable direction in which to attack the ore under the Flat dyke, shown in Fig. 2.
To start the system it was necessary to sink winzes from the various levels. One chamber on both the 850-ft. and 750-ft. levels had at this time been opened out only on the sill-floor. The floors were levelled off, and square-set timber erected. In the remaining chambers at least two cuts under the chamber system had for the greater part been taken out. Filling was then introduced wherever possible, and in most places was hand-packed to the back. When square-sets were to be erected on filling, 12-in. x 4-in. hardwood sollars from 12 ft. to 24 ft. long were first laid down close together, with their length across the chamber, care being taken to stagger the joints and to keep the timbers from resting on the bulkheads or passes, so as to ensure even shrinkage. Ordinary caps and struts were then laid on top of these as sills. Where a cut was advancing under the chamber system, square sets were erected as close to the face as possible. Temporary pig-styes of 9-in. x 9-in. timbers were built up under the back of the previous out; then the cut was continued, the pig-styes being removed and set timber erected. This was done to secure the ground and allow of paddocking and hand-packing the stope on either side of the ore-way, as shown in Fig. 4. The open sets were left over the ore-way to keep unnecessary weight from it in the event of any large displacement of ground, and also to facilitate opening up the sections.
Drives are made 10 ft. wide by 9 ft. high, two machine drills being employed. Very little timbering is required, except where passing through dykes. Drive sets are spaced 5 ft. centre to centre, and 2-in. round-backed slabs are used. Legs and caps are not less than 10 in. in diameter.
When timbered, winzes are 8 ft. x 6 ft. inside measurement; joggled slabs 9-in. x 3-in., resting on 9-in. x 5-in. frames, are used. The latter are spaced 20 ft., except where the ground is bad, in which case the distance apart is diminished. These winzes serve as mullock-passes, and, although they are made large, the filling occasionally hangs up in them. Their size also permits of sinking with two machine drills.
The square-set timbers are 9-in. x 9-in. ironbark or spotted gum, which is plentiful and easily obtained in the surrounding district. Logs 13 in. in diameter are delivered at the company's sawmill at 10d. per running foot, and are there cut to size, ready for erection in the mine. The slabs obtained in squaring the logs are used underground.
The legs are 7 ft. shoulder to shoulder, except on the main level floors, in which case they are made 8 ft., to give sufficient room for chutes in the main ore-ways through the stopes. Caps are spaced 5 ft. and struts 6 ft., centre to centre. The detailed dimensions are shown in Fig. 6. Struts run across, and caps along the stope. In laying down the sill-floor the ground is levelled, and then ordinary struts and caps are laid down as sills, the space between being packed with broken ore, which is recovered when the floor is picked up. The sets are erected, and the floor close slabbed, first with 9-in. x 2-in slabs, and then with round-backs. The floors of ore-ways consist of two layers of 9-in. x 2-in. slabs. At one time sills long enough to carry three sets were used, but these have been discarded for many years as inferior to short ones.
The ore-ways on the main levels are made 10 ft., or two sets, wide, and in this case long sills are used between the legs. Along the ore-ways legs 15 in. to 18 in. in diam. are substituted for 9-in. x 9-in. timber, and the caps are double and of the same dimensions. On account of this, shorter legs are required over the main ore-way. These are mortised into the top cap. Angle-stays are put in from the top of the centre leg to the bottom of the
outside legs, thus relieving the caps of a good deal of weight and throwing it directly on to the drive-legs (Fig. 7). The sides of the ore-ways are covered with round-backs. One thickness of 9-in. x 2-in slabs is laid between the caps, the upper one being held in place with two ¾-in. diam. iron dowels driven through it into the main cap near the legs. The sets are then erected, and poles laid close together on top of the upper cap, the ends of one set of these overlapping those of the next. In opening put the first 60-ft. x 30-ft. section the drive on the sill-floor is cut out to about 30 sets in the vicinity of
the winze, which is then stripped to the level above to a size sufficient to admit of four or six sets being erected on each floor, the timber being carried up as the stripping proceeds. In the former case two and in the latter three of these sets are in the succeeding section. One set in the winze is lined with 9-in. x 2-in. slabs to form a temporary ore-pass, which is afterwards converted into a mullock-pass for filling the section, the other sets being left open for ladder and timberways. While the winze is being opened out, the remainder of the sill-floor is being stoped. On that side of the stope adjoining the 20-ft. pillar the ore is taken out as neatly as possible, only leaving sufficient room for the sets to be erected. Alongside the pillar of ore the set timber is slabbed on the inside with round-backs spiked on, and with 2 in. to 3 in. spaces between them, but where the pillar has been cut into under the old system, the outside also is slabbed with round-backs, the space between the pillar and slabbing being tightly packed with broken ore, which is recovered with the pillar. Alongside the South dyke no slabbing is required. That end of the section from which the next will be started is paddocked off, with the exception of three sets, which are left unfilled from level to level for the purpose of giving access to each floor as stoping proceeds. Ore-passes are formed in the square sets where necessary. They are lined with 9-in. by 2-in. slabs, placed vertically, and ladderways are left up and down alongside the mullock-passes.
Particular attention is paid to keeping the timbers plumb and square, and also to the blocking of the walls, faces, and backs, and it is insisted that this should be done at the joints of the sets alone. Blocks, 9-in. x 9-in., are used, and are wedged as tightly as possible. Should the distance between the legs and the wall be 2 ft. or more, hitches are cut. As soon as sufficient ground has been taken out to admit a set, timber is placed in position, except on the sill-floors, where the sets are at times kept from 10 ft. to 12 ft. from the face. This is to minimize the danger of legs being broken by firing.
It occasionally happens that the set timbers show signs of failure under vertical pressure, in which case double-banking is resorted to.
This consists of reinforcing the caps, struts, and legs with the timber recovered from old stopes in the open cut, and tightly wedging them between the caps and struts.
Should side pressure be expected the tenons are reinforced with 9-in. by 2-in. slabs spiked on to the struts or caps between the legs, and, if necessary, angle-stays are used, as shown in Plate LXV. With angle-stays there is a tendency to lift the caps or struts, but this is prevented by tight blocking at the backs.
When the second floor is nearing completion, the filling is allowed to rill as far as possible from the pass. A temporary chute is then put into the mullock-pass on the second floor, and filling trucked into the floor below. The chute is removed from floor to floor till the stope is filled.
Should bad ground be met with, paddocking and hand-packing are resorted to on the highest floor.
Mullock, which is particularly suitable for filling, as it packs closely and is not subject to great shrinkage, is supplied from the open cut through two main mullock-passes. These passes, when full, contain sufficient filling for three days' work, and thus ensure a supply in the event of the mining of mullock ceasing for a short period in the open cut, as occasionally happens during wet weather. All dyke and waste material broken underground is utilized as filling. In one stope where sollars were laid on filling 50 ft. deep, which has since been carried to 80 ft. above this, very little settlement has taken place, and no difficulty has been experienced in keeping the timbers regular.
As the second floor is cut out loose 9-in. x 2-in. slabs are laid on top of the sets. This is to prevent loss of ore in the filling and for general convenience in the stope. These are removed from floor to floor as the stope progresses.
The sill-poles laid down under the chamber system have been picked up on the 750-ft. level alongside the South dyke, for an area of 60 ft. x 30 ft., with ease and safety. There is no perceptible movement of the timbers on this level, although there is 130 ft. of filling above them. The picking-up floor was tightly hand-packed. The method of picking up is shown in Fig. 8.
In the gold ore, to the east of the Andesite dyke, many levels have been picked up under square sets at various tunes without difficulty. An illustration is found in the south-west stopes, and is shown in Plate LXV. The ground is cut out for two sets wide com-
pletely across the stope, and is carried up to the sills above. As the mining proceeds, sets are slabbed off to within one set of the face and filled. This is completed before the next strip is started. Temporary open ways, which are afterwards filled, are left in the centre back to the ladderways and passes. In this instance the picking-up floor has settled as much as 12 in. This stope extends
in some places to the open cut for a height of 210 ft. above the level being picked up. In other places it does not rise to the surface. In the latter case particular attention is paid to the blocking at the back, so as to keep it tight.
In No. 2 chamber, 750-ft. level, on the north-west side of the fault, gold ore, in which a stope has been opened up, occurs adjoining the first section in the copper ore in that chamber. As some of the sections in the latter will be completed both above and below the 750-ft. level, before this gold ore is worked out, it was decided to advance this stope in the opposite direction to that of the copper stopes, so that the ore and filling for it should not pass over the worked-out portion of the sections in the copper ore. The ore-ways through these stopes are being connected to drives running parallel to them in solid ground (Fig. 1).
The sill-floor of this gold stope was cut out under the chamber system for a length of 170 ft. and width of 60 ft., and timbered with square sets. This is being taken out for its full length and width for a height of five floors, which is to allow the first section in the copper ore to get sufficiently advanced before the sectional system is started in this stope. Although the back of the stope is flat and long, it is strong, as the ore-body has been displaced by the fault, and neither the South nor Flat dyke occurs in this part of the mine.
Fig. 10 shows the intersection of the South and Flat dykes with the ore-body, and the method of winning the ore from under the latter. As the ore has been undercut under the chamber system from the Andesite dyke to the fault, the presence of a vertical transverse dyke or head renders the ground under the Flat dyke still more difficult to mine. The stope has been filled up close to the back for nearly its full extent.
The following is the method of mining this ore 'It must be pre-supposed that the ore has been taken out, leaving a face across the stope with a slight batter, and that square sets are in place, being erected vertically from the foot of the face up to the top of the Flat dyke, and that the sets have been filled, leaving those nearest the face open, and lane-ways back to ore-passes and ladder-ways.
As a rule, two sets are then advanced along the dead-wall, after which the stope is cut across to the South dyke for this width, sets being erected to the back as soon as there is sufficient room.
Where the Flat dyke is two sets or more above the sill-floor, the ore under it is worked out from the top of the dyke downwards with a batter. Poles are placed over where the men are working to protect them till these sets can be put in. Should the top of the Flat dyke be more than 2 ft. above the set below, but not high enough to admit a set, temporary bulks are built on the timbers so as to support the back. The filling is kept as close to the face as possible. The ore is then cut out from the South dyke back to the dead-wall to the height of the highest set, to form a flat back. Ironbark poles, 6-in. diam., running the length and breadth of the stope, are bolted to the legs so as to steady the timbers. Where the ground above the Flat dyke is found to be particularly good, a strip four sets wide has been taken out across the stope. The working face is kept not less than 30 ft. in advance of the 60-ft. x 30-ft. section, which is following it. It will be seen that this is a modified form of the sectional system, in which the length of the section has been reduced in general to 12 ft.
Up to the present none of the pillars left under the sectional system have been mined, but no difficulty in recovering them is anticipated.
The chief features of the sectional system with square sets, which combine to render it successful at Mount Morgan, are :'
- Its safety, which is due to'
(') The small area of the roof of each section.
(b) The support given by the pillars while required.
(c) The strength of the square set timbers.
(d) Its flexibility'it being possible to remove, where necessary, ground intersected with dykes and heads, without undercutting. - Its adaptability to the open chamber system of mining, sections being started either on filling or sill floors, and the pillars left under the old system being utilized.
- That no more ground need be unsupported by timber at any time than will admit of the erection of one set.
- That, by slabbing over the sets, the miners are protected, whilst boring, from loose pieces of ground.
- That the filling packs closer than if rilled, due to the mullock being trucked in floor by floor and packed under the struts and caps, and left for some time before the next floor is filled, during which it settles as it is tramped over and subjected to vibration by the machine-drills and firing.
- That the great number of faces that can be worked in a stope, the quickness with which machine-drills can be rigged, and the fact that the floor on which the miners are working is free from broken ore (this being shot down on the floor below), all contribute to give the machine-drills a large breaking capacity, with the result that as much as tons of ore a month is frequently broken per machine.
- That the ore can be removed to the passes, if necessary, while mining is proceeding.
- The ease with which filling can be run into the stope and distributed, and with which it can be paddocked-off and hand-packed to the back.
- That the working stopes can be well ventilated, as the open sets left for mullock-passes, ladder and timber ways, need be the only connections from level to level.
In the main drives and ore-ways trucking is done by electric motors to pockets over the main inclined shaft. These pockets are tapered from 8 ft. x 8 ft. at the top to 8 ft. x 12 ft. at the bottom. They are timbered with 9-in. x 3-in. joggled slabs and 9-in. x 2-in. vertical slabbing.
Should a large quantity of ore hang up in a pocket over the main shaft it would probably cause serious damage to the shaft timbering when freed, and it is to minimize the danger of this that they are made in this shape ; neither is there so much wear and tear on the timbering due to friction as in vertical pockets. The main inclined shaft starts at 318 ft. and goes to -ft. level at a uniform grade of 1 in 1. It is connected with all levels from 450 ft.
down, with the exception of the 512-ft. level. The shaft has three compartments, two of which, 5 ft. 6 in. x 6 ft. 6 in., are used for raising ore, and the third, 3 ft. x 6 ft. 6 in., for a stairway. The sets are of 9-in. x 9-in. hardwood spaced 5 ft. centres (Fig. 14).
The door is concreted flush with the top of the sills, and the tracks are laid with 40-lb. rails, with a gauge of 4 ft. 3½ in. The ore is hoisted in self-dumping skips, capable of carrying 5 tons.
Timber, steel, and other supplies are sent into the mine through the Linda supply shaft, which starts at 450-ft. level, and serves all levels from 650 ft. down. The inclination of the shaft is 1 in 3, and there is a double track of 2-ft. 2-in. gauge, which is the standard throughout the mine and on the surface. This enables timber to be sent direct from the sawmill to the level on which it is required. This shaft is also to be used for lowering and hoisting men.
A shaft is being sunk with two compartments, one for mullock and the other for air. This is situated in that, portion of the mine furthest from the present downcast, and should considerably increase the circulation of air (Fig. 1).
All mining is done by contract, and most of the filling. Mining is paid for by the set or toil, driving and winzing by the foot, and filling by the set.
Discussion
Mr. F. Danvers Power said the first thing that struck one on hearing this paper read and going through the mine was the large quantity of timber employed in the present method of extraction ; and the question that naturally arose in one's mind was, whether in many parts of the mine some other method, such as the slice-and- fill, the ore being taken out in slices say 10 ft. wide with an arched roof, and the filling kept well up, could not be used with equal safety to the miners, and far less expense to the company. That branch of geological survey termed in another paper ' Mine Sectional Analysis' should be of the greatest use in determining the proper way to approach blocks of ground bounded by faults and dykes, and also in giving an idea as to which ground should be treated as treacherous and which as fairly safe. He noticed that hardwood was employed as being superior in strength to Oregon pine, and yet it was weakened by using it squared, which must cut across the grain in places, instead of using it round. In the Hartz mountains, Germany, where the square set system of timbering originated, they used round timber, and in many other places, both in Australia and the United States, they now used round timber in preference to squared, full advantage being taken of the shape of the timber at the joints by bevelling the wood. The Mount Morgan caps and struts were of different lengths. In some mines they saved a little timber by giving both sticks the size of the larger member, or by having the struts of smaller scantling. It was mentioned that the long sills which stretched over three sets proved inferior to the ordinary short sill for the sill floor. Was this because it was found more awkward to handle the longer sticks of timber, or were there other reasons that counterbalanced any advantage in picking up longer sills when coming up from below ? Referring to Fig. 7 of the paper, he would like to know what was the objection to allowing the angle stays shown in the short set above the ' oreway ' or gangway, to take all the weight from overhead and transmit it to the legs ? A centre leg as shown would transfer much of the weight vertically to the weakest part of the cap, and he understood these caps had been known to break. Were not the slabs between the two caps difficult to replace in case of renewal being necessary ? If they were afraid of the angle braces breaking the tenons of the side legs by lateral thrust, then it looked as if the packing was not so tight as one was led to believe. It was well known that the best system of timbering could only steady ground, and was no good for holding up great weights. The best one could do was to control a block of ground. Filling helped to reinforce square sets, but it will shrink, even when hand packed, and it was notorious that it could not be tightly packed in a network of timber, and therefore it only served as a partial support. He had seen the timber of gangways split into match wood, by the fall of a comparatively small block of stone on the filling of square sets three or four floors above. The authors had mentioned that the mullock packed closely, and that their main mullock pass holds a supply for three days. Under these circumstances, he asked was there not fear of the mullock passes hanging up ? By leaving pillars of ore to be subsequently extracted, were they not artifically making conditions somewhat similar to blocks of ground bounded by dykes and faults ? Such pillars had no lateral support, and when the upper level was worked out, and the pillar undercut, the ends were the only support left.
Mr. James Hebbard said, having seen the very excellent -system of mining adopted at Mount Morgan and learned its excellency from the immunity from accident which had resulted from it, he thought that discussion of the particular paper before them could be very much shortened: the immunity from accident being the clearest possible proof that the system adopted was as it should be for the protection of the men who were engaged in the extraction operations. He had the pleasure of visiting the mine during the day and he felt free to say that in his opinion the problem of working the particular character of ore body under review had been tackled with a view to the maximum amount of safety for the men, and altogether in a most excellent manner. Wandering through the stopes, one was struck with the similarity to the general idea which existed at Broken Hill. He spoke as a Broken Hill man, and a strong advocate of the system adopted there, with their various modifications; he could of course only say that it struck him as a very admirable one. He expressed this opinion with the knowledge that they had a clear proof of its benefit by reason of the immunity from accident. Looking at the Mount Morgan system generally and with a very limited knowledge of the general arrangement of the ore body, he expressed any opinions regarding what the future working of the mine on that system would be with a very great amount of diffidence, but it appeared to him that could the system have been laid out so as to leave the proposed pillars abutting against the dyke that run through the centre of the ore body, instead of parallel to it, it would not only have made for future safety and stability, owing to the very strong natural support which would be given by the dyke through its remaining intact, but they would have had, for at least 60 or 70 % of the total ore to be extracted on any particular level, the added support of the pillars or piers abutting on the dyke. It therefore seemed to him, from a cursory glance of the lay-out, that the system would have been somewhat improved by having the pillars transverse to the dyke, instead of parallel to it. In regard to the reversion to square sets instead of pigsties, he might be allowed to express the view that in this particular they had erred on the side of excess caution. Theoretically, the back of a stope was supported by the timber placed therein for that purpose. In practice, however, where mullock filling was adopted, ore in the back was never supported and must necesarily fall, unless of such, a shape or strength as to be self-supporting. It followed, therefore, that in the ordinary operation of mining, even though the greatest possible care was taken in wedging between the timbers and back of the stope, the shrinkage of the timber and the added drag of the mullock invariably left the back unsupported. This was not so evidently the case where bulk-heads or pigsties were used because places permitting wedging up were always more accessible between the pieces forming layers in the pigsties than immediately over the top of the sets. Pigsties were therefore more effectual in preventing large movements of ground than anything in the way of square sets. To make his meaning clearer he would cite one example, viz.:'a regular system of bulk-heads spaced equi-distant in all directions gives support in the shape of a pillar as compared with the post forming one of the sets, and in addition, should reinforcing be required it can always be done by booming or bulking between the pigsties, thus distributing the weight of the back over the pillars and affording a more general support than can be got by struts or caps forming the beam between the posts. The movement of a large body of ground from the back, such as would occur in this and every other large mine in which there were defined faults or weak places in the general structure of the ore body, would certainly crush every set of timber used in the back of the stope if square sets alone were relied on. He had seen this happen so many times that he felt sure it would occur again. He had seen it repeatedly. The whole top run of the stope of square sets would be splintered to absolute matchwood by a slight movement that could not in any way be termed a creep, and he had seen, in similar ground, an area of 200 ft. x 180 ft. set off in the same manner on bulk heads, and the total movement would not be 6 in., and no damage done. It seemed to him therefore, that in the face of the certainty of large movements in a way that might be expected, the position in the Mount Morgan mine would be better safeguarded by a return to some modification of the bulk-head system they formerly used in the mine. He expressed this opinion from a very large experience in the matter. The circumstances, he admitted, were somewhat different at Mount Morgan to what they had at Broken Hill, particularly in the Central mine; but they were not different in one particular, and that was that with square sets the back was never supported in practice whereas with bulk-heads they could be. He would guarantee that they could go through the Mount Morgan mine tomorrow, notwithstanding the extra care that was evident in safeguarding the men and the workings, and on examining the back of any of the stopes they would find that a large proportion of wedges placed between the top of the set and the back of the ground were loose. If this were so, of which he had no doubt, it would very clearly support his contention that by using square sets combined with mullock filling, the back was never really supported in practice and invariably gave way unless inherently strong enough. With the system of bulk-heads set up equi-distant, explained in his earlier remarks, and joined by beams in the form of lagging in the same way as they lag the back of their sets, they did as an actual fact in practice complete the connection between the mullock filling, per medium of the bulk-head and the back by constant wedging up to a point where the wedges could be easily reached and constantly attended to, so that there was a chance of better support being obtained altogether apart from the fact that the bulk-heads were better able to support the weight of any falling ground than the square set timbers. At Broken Hill, in ground that was a long way more liable to flake and flaw than at Mount Morgan, he practically adopted the bulk-head system which he had described. There had never been an accident that could be attributed to the system itself, although the Central mine was well known as one having had an extensive creep. He was quite certain of his statement in saying that the creep was not in any sense due to the system of pillars and stopes as adopted at Mount Morgan. It was mainly due to the particular condition of the hanging wall which lay at a very flat angle and was of a very rotten character. When the depletion of the pillars was commenced, these had not only to support the overburden proper to the Central mine, but, owing to the depleted condition of the adjoining mines, had practically to support an overburden of something like four or five times its own area. In the ground that was already broken by the creep in the Central mine, the overburden they were carrying at present was estimated at anywhere between 20 and 30 million tons. There was a constant shrinkage over the whole area, amounting to 1½ in. per month, and it was a fact that mining was carried on under these conditions, with as great an amount of safety by square setting plus bulk-heading, as ever it had been in the history of Broken Hill. In ground unaffected by creep, they were working under the equi-distant bulkhead system already described. He felt convinced that the system referred to not only gave greater security for the moment, but it provided that, in the event of a fall of ground, much less damage would occur. With regard to the quantity of timber required, he believed that when the bulk-head system could be carried out in entirety, with the layers of mullock filling put in regularly, the bulk of the timber could be recovered, but if conditions were such that bulk-heads could not be recovered, then, there was very little to choose in actual cost of timber between bulk-heading and square-setting. Of course, with the bulk-head system the ground could not be so conveniently worked. Absolute regularity in extraction and filling was necessary in order to be able to count on the recovery of the timber. With the square set system of timbering one had more latitude, so that the periods for filling in the depletion could be chosen instead of being fixed by the condition of mining. Comparing the two systems, however, he came to the conclusion that the bulk-head system effected the greatest stability to the workings and a much greater factor of safety to the men, which, in his opinion, far more than counterbalanced the handiness and convenience in working obtained by the adoption of the square set system. He thanked the authors of the paper for the very clear and lucid description of the system adopted at Mount Morgan, and although he had yet to find out the exact reason for the use of an underlay shaft for hauling purposes, he felt satisfied the reasons for its use must have been perfectly sound.
Mr. W. Poole thanked Mr. Hebbard for giving them the benefit of his valuable experience at Broken Hill, first for a number of years as an Inspector of Mines, when he had the opportunity of almost daily seeing the operations in all those large mines under varying conditions, in the soft sulphides, afterwards in the soft carbonates and later on, the hard sulphides ; and while in thorough agreement with Mr. Hebbard as to the comparative value of the two systems described by him, yet he would have had some diffidence in openly asserting this opinion in opposition to the views held by the authors of the paper, had he not been strengthened by Mr. Hebbard's large experience.
MR. H. S. White questioned the point put forward by Mr. Hebbard in regard to the system of working. One important fact had been lost sight of by that speaker, viz.:'When the system described by the authors was introduced at the mine, it was impossible to have the pillars at right angles to the main South dyke, as in the chamber system of mining formerly in use, the chambers had been taken out parallel to the dyke in question, and the new system of mining had to start where the old left off. Much of what Mr. Hebbard had said would be obvious and every-day knowledge to those who have had experience of big underground work, and who knew the necessities and difficulties in coping with bad ground, with possible falls of ore. Mr. Hebbard's view was not in accord with the present conditions of working. The new system adopted must be dissociated from the past, and with this explanation he (the speaker) had every reason to justify the position of the chambers. With reference to Mr. Hebbard's remarks as to the timbers never being close up to the back, he disclaimed the statement, as from his experience they were wedged up, and kept tight by men employed for that purpose. With regard to ore filling, it was not subject to much shrinkage, being trucked in floor by floor, and not rilled as he understood was the practice at Broken Hill. In referring to the plan of timbering at Broken Hill, he understood that all the square setting that had been done on that field, had been done with Oregon pine. There was a vast difference between Oregon and ironbark, and he maintained that there was a very strong support to the back from the square sets with the timbers used at Mount Morgan. They had practical illustration of it. It was not saying too much to assert that they had had blocks of ore from 14 ft. up to 20 ft. in thickness resting on the square sets for months. Another matter he might point out to Mr. Hebbard, was that their sections were small'60 ft. x 30 ft. '60 ft. across and 30 ft. in length, and if any bad ground was met with they erected bulk-heads. They did not rely entirely on the square sets ; the system was to paddock their square sets, and hand-pack to the back, and he had some doubt as to the belief that it was easier to wedge bulk-heads than it was to wedge the square sets'his own experience had been to the contrary. Mr. Hebbard had made some remark about the future working of the mine. On this head he would like to point out, very particularly, that the sections were started from the fault, and they were working them up from level to level. They worked the whole of the sections back to the Andesite dyke, and at the same time towards the inclined shaft. With respect to the working of the ore to the north-west of the Andesite dyke, that was a point they had fully under consideration. They had already drives leading to it, so that the ore would never go over depleted stopes. Mr. Power had made some remarks with respect to the filling of the stopes, and thought that the passage quoted by him might be misleading. Perhaps a word in explanation would clear up any doubt as to the authors' meaning. The passage called in question read as follows:'' When a stope in one section has been worked to a height of 62 ft. above the level below, it is filled and bulked if necessary.' The reference might be clearer if the words ' filled and ' were omitted, so as to make the sentence read ' it is bulked if necessary,' although in an earlier part of the paper it was explained that the filling was carried up floor by floor, and that not more than two sets were kept open from the back.
Underground Mine Timbering & Support - 911Metallurgist
No matter how limited their extent, few underground mining operations progress very far without requiring some sort of support. This Bulletin presents discussion and sketches as a guide for designing underground support of timber, concrete, or steel in relatively shallow workings.
Because timber will satisfy most support requirements, this discussion offers methods for supporting drifts, raises, shafts, and stopes, as well as suggestions for framing and later transporting packaged units into the mine. And because small mine operators may not be aware of the importance of properly blocking timber sets in place, this frequently slighted but important aspect of the supporting process is discussed. Drawings and sketches are used to show various timber sets and methods of erecting and blocking them and the accompanying text includes pertinent supplementary remarks. Another subject introduced is treatment of timber for prolonging its life, which, on occasion, should be considered even by the modest operator. Then, because rock bolts are in wide use today for replacing or supplementing timber, their use and installation are extensively outlined. Also the advantage of replacing collapsed headboards or blocking before failure of the main support is discussed. Several drawings and designs are offered for actual dimensioning and design of chutes for limited tonnage operations, which has been inadequately presented in the past.
For areas where timber is scarce or expensive, reinforced concrete sets of simple design should be substituted. Designing these sets by ultimate strength procedure is discussed in some detail. Similarly, a higher working stress for timber is also suggested, as are standards in working stresses for concrete, steel, and timber in mine-support design that are different from those used for surface structures.
Although headframes and ore bins are not a part of mine support, most mine plants find them necessary; for this reason information on these two surface structures is also included.
Timbering
Support of underground openings is much the same for both large and small mining operations. Essentially, the difference lies in the depth and in the extent to which the two types of work are compared.
Most large mines are deep, with many miles of drifts, raises, stopes, and shafts with open spaces more or less loosely supported by rock pillars, fill, and timber or other material, or by a combination of such supports. As a rule, the difficulty of maintaining openings increases with depth, but even shallow workings at times encounter very heavy ground and may also be disturbed by rock bursts.
- Application Of Rock Bolts
- Bolting patterns
- Beams and roof ties
- Anchorage capacity and bolt loading
- Problems of bolt use
- Advantages of roof bolts
- Installation sequence
- Using Steel Sets for Timber Support in Underground Mining
- Use Of Concrete Sets
- Design Of Concrete Sets
- Ordinary set
- Loaded drift set ' cap
- Spreader Bearing
- Bond, Shear, and Stirrup Spacing
Prompt consideration should be given to one of the leading causes of ground failure: the effect of moist air on certain rock-forming minerals. Many subsequent support problems could doubtless be minimized if the circulation and penetration of moist air were immediately controlled.
An explanation of ground support is best presented by illustrations supplemented with written explanation. In the present discussion, strict 'drafting rules' have not always been followed when preparing the illustrations. In many instances, where adhering precisely to rules of mechanical drawing would have caused confusion, liberties have been taken with common drafting practice, and certain irrelevant lines have been omitted.
Every effort should be made to standardize design and dimensions of timber sets. Also, the number of saw passes and cuts during framing should be reduced to the minimum.
Standardizing drift sets, chute assemblies, raise sets, and other applications reduces both the timber inventory and the confusion of having several pieces serve the same purpose. In some instances pieces of a set may be made interchangeable (for example, caps and girts in square-sets).
When it is warranted, similar pieces may be packaged by using wire wrapping or iron strapping. Wedges, chute assemblies, and other units should be packaged for transportation underground.
Even a casual inspection of mining operations will indicate many applications of timber in addition to those presented here. Such additional uses are left to the ingenuity as well as the requirements of the reader.
A discussion of ground support would not be complete without including at least an introduction to rock bolts, steel sets, and concrete sets. Occasional use of these materials, especially rock bolts, is not unusual at small mines. Concrete sets may be especially useful where localities are not well supplied with timber, or where underground conditions promote rapid decay of timber. Under these circumstances, concrete might be used economically by the small mine operator.
Estimation of Ground Pressure with Selection of Support
Ordinarily, one must know rock mechanics to estimate ground loads. For the underground conditions usually encountered in shallow- to medium-depth operations, however, a detailed application of rock mechanics is of doubtful value. Certain maximum conditions may be assumed. As a rule, underground support based upon such assumptions will be quite satisfactory, at least for temporary service.
As a basis for estimating loads on timber sets (loads on steel or concrete may be estimated in a similar way), the following data are given.
Table 1 (Proctor and White, , p. 91 and Feather River and Delta Diversion Projects, , p. 67) gives information for 10 different ground conditions.
The material in Table 1 may be better understood by consulting Figure 5e. According to Proctor and White, the load formulas have been amply verified by experiment and practical observation. A few remarks will explain the data. Column 1 classifies the ground condition by using the physical properties and mineralogical composition of the rock. The 10 conditions shown will apply to any type of ground. Column 2 gives the formula for calculating the maximum height, Hp, of loose rock; in other words, the height at which a permanent arch is likely to form. (For want of a better term, arch is used, although grave doubts exist as to whether a true arch actually forms). And finally, Column 3 suggests a spacing for the sets.
In Figure 5e, the average side pressure on the drift is given by ph = 0.3 w (0.5Ht + Hp) pounds per square foot, where w is the weight of a cubic foot of freely flowing, sandy material (Proctor and White, , p. 63). The pressure is considered to result from material with a consistency of and ability to flow like sand. This analogy is justifiable because certain rocks will, upon alteration, form a sand-like mass (for example, certain granites, gneisses, schists). A difficult decision arises when assigning a value to w.
Note well the units used for ph. When the formula is solved, the answer is the average pressure in pounds per square foot, as will be illustrated later.
Figure 5e suggests that the load on the cap results from combining two different portions of the loose rock mass. One of these, WA, will depend for its bulk on the point at which arching (stabilization) begins. This zone is rectangular in section (section A). Above section A the loose mass will assume a more or less irregular shape, depending on the physical properties of the rock. For the purpose of the present discussion the outline representing the arch will be assumed to be either WB or WC. The total load W on the cap will result from + Wg or WA + WQ. Blocking of the cap is assumed to be so tight that the cap will, at least when first installed, support W without help from the posts.
This whole problem is based on rather uncertain data; therefore, the weight of the cap is ignored. It would be negligible compared to the weight of rock.
Table 2 (Wood Handbook, , p. 50-53 and 105 and Staley, , p. 51) gives working and ultimate stresses for timber species commonly available for mine use. The working stresses listed in the table have been adjusted so that they can be applied to material similar to common grade and probably somewhat wet. Most mine timber will have been treated for protection against decay. The values given are conservative.
Column 5 gives the straight line formulas for columns (this is the type of loading that the posts in a tunnel or drift set would resist; some caps may be loaded in a similar fashion). Straight Line column formulas are easily applied and are sufficiently accurate for approximating the solution of ground-support problems.
Table 3 (after Proctor and White, , p. 232) gives data for a few commonly encountered rock-types. When the material loosens and falls or exerts a swelling action through alteration, the weight per cubic foot will be less. Just what this decrease is assumed to be will depend on the judgment and experience of the user of these data.
To illustrate the application of the data in Table 1 and Table 2, I have selected a timber set for the drift shown in Figure 5e. This same information will be used again for a concrete set.
Solving a problem of this kind involves the application of several simple strength of materials formulas. These are:
- Bending moment formulas which depend on the loads represented by WA, WB, or WC.
- Column formula for the load on the posts resulting from W. (strictly speaking, W is the vertical component and should be resolved along the post. The resulting slight increase, however, may be neglected.)
- Bearing between the posts and the cap (compression perpendicular to the grain in the cap).
- Bending in posts resulting from side pressure and bearing of post against spreader (design here is influenced by compression perpendicular to grain of the post). A more refined procedure, which would combine the direct stress W with the bending in the posts, is not considered necessary here because bending is so much greater; but in some instances this procedure should be investigated.
To arrive at the size of the members making up the cap and posts, I shall take several minor liberties when applying the formulas. This deviation is justifiable on the grounds that Hp and W are not subject to exact determination and that all assumptions are on the conservative side.
Timber Cap Selection
Known and assumed data are:
- Width of drift at the top = 1 = 6 ft. 3 in.
- Average weight of fallen and compacted rock with additional squeezing effect = w = 160 lb. per cu. ft.
- Distance between sets, center to center = c = 5 ft.
- Hp = 0.31 (B + Ht) = 0.31 (8 + 9 ¼) = 5 ft. 5 in.
- Height of section A = ha = 2 ft. 3 in.
- Height of section B = hb = 3 ft. 2 in.
Bending moment formulas (1 is in inches):
MA = 1/8 WA 1 , in.-lb.
MB = 1/6 WB 1, in.-lb.
MC = 0. 144 W 1 , in.-lb.
M = 1/6 s b d², in.-lb.
where,
s = Allowable working stress in extreme fiber (see Column 2, Table 2).
(See later suggestion recommending higher percentage of ultimate strength for s).
b = Width of cap, inches.
d = Depth of cap, inches.
l = Width of opening, inches.
The timber species will be Rocky Mountain Douglas fir (commonly called red fir), For this material s = lb. per sq. in.
(All calculations are made with a slide rule).
WA = ha 1 c w = 2 ¼ x 6 ¼ x 5 x 160 = 11,240 or 11,200 lb.
WB = (½ 1 hb) c w = ½ x 6 ¼ x 3 1/6 x 5 x 160 = 7,930 or 7,900 lb.
WC = (π1²/8) c w = 1/8 x π x (6 ¼)² x 5 x 160 = 12,280 or 12,300 lb.
To illustrate the calculations for a cap, we shall assume that the rock eventually stabilizes with an arching effect similar to WC. An identical procedure would be followed for WB.
MA = 1/8 WA 1 = 1/8 x 11,200 x 75 = 105,000 in.-lb.
MC = 0. 144 WC 1 = 0. 144 x 12,300 x 75 = 132,800 in.-lb.
Mtotal = MA + MC = 105,000 + 132,800 = 237,800 in. -lb.
By applying M = 1/6 s b d², the cross sectional size of the cap is obtained. Because there are two unknowns in the formula, a trial and error solution must be computed It is always desirable to take d equal to or greater than b.
When the formula is rewritten,
d = '6 M/s b, inches
Assume b to be 10 inches.
(Timber for most underground uses is unsurfaced. Therefore, its dimensions are nominal or rough. If surfaced material is used, its dimensions are usually ½-in. less than the nominal for sizes other than planks; so for dressed lumber the surfaced dimensions must be used).
d = '6 x 237,800/ x 10 = 10.8 in.
Commercial sizes are customarily available (these dimensions change by 2-in. increments). If so, d would become 12 in. Thus it would appear that a 10- x 12-in. cap would be needed. But lumber is sold on the basis of boardfeet. A 10 x 12 represents 10 boardfeet per foot.
Eight inches for b will be tried. With this value d = 12.2 in. This figure is sufficiently close to 12 in.- that an 8- x 12-in. cap would do. Here but 8 boardfeet per foot is required, thus saving the cost of two board feet.
As shown in Figure 5e the cap is 8 in. x 12 in. x 5 ft.
Selection of Standing Posts
Posts are ordinarily selected to act as columns which must resist bending from the side pressure ph, and are also checked for bearing against the spreader on the bottom side of the cap.
The total load on the cap is equally supported by the two posts, which assumes the end blocking on the caps has loosened.
P = WA + WC/2 = 11,200 + 12,300/2 = 11,750 lb. on each post.
Consulting Table 2, the column formula for Douglas fir, Rocky Mountain species is found to be,
P/A = (1 ' L/60d), lb. per sq. in.
= ' 20L/d, lb. per sq. in.
where,
P = load on post = 11,750 lb.
A = area of post, sq. in.
L = unsupported length of post, in. = 93 in. (See Fig. 5e).
d = least dimension of post, in.
b = other dimension of post, in.
Experience shows that bearing against the cap (design of joint or connection), not the member acting as a column, will usually dictate the post size. Checking for dimensions to satisfy bearing perpendicular to the grain should be the first step. From Table 2, the allowable working stress perpendicular to the grain of Douglas fir is 310 lb. per sq. in.
11,750/310 = 38 sq. in.
One dimension of the post must equal the width of the cap (b = 8 in).
38/8 =4.7 in.
But 6 in. is the smallest mill size nearest to 4.7 in. The post is tentatively taken at 6 x 8 in.
For more Split Sets Underground Mininginformation, please contact us. We will provide professional answers.
These values are now used to check the post as a column.
' 20 x 93/6 = 890
but 11,750/6 x 8 = 244
890 > 244
Acting as a column, the 6 x 8 selection is more than ample. Anything less than this size will crush the cap fibers through bearing.
Post in bending
In Figure 5e, the dotted rectangular section plus the dotted triangular portion would, under certain circumstances, cause the side pressure on the post. Several approximations will be used to establish the maximum load against the post.
(1) Assume the rock alters and decomposes into a moist sand. Proctor and White (, p. 63) suggest that the average pressure resulting from this column of sand is represented by ph = 0.3 w (0.5Ht + Hp), lb. per sq. ft., where w = the weight of one cubic foot of sand.
(2) Moist sand in place has a bank weight of about 130 lb. per cu. ft. (Basic Estimating, (no date), p. 14). ph =0.3 x 130 x (0.5 x 9 + 5' 5') = 386 lb. per sq. ft. average pressure. Total W = ph c times height of post, lb. = 386 x 5 x 7 ¾ = 14,900 lb.
(3) The effective loading on the post is similar to the dotted triangle shown in Figure 5e. The base of the triangle is taken equal to the length of the post or 93 inches. For this type of loading, where load is increasing uniformly toward one end,
M = 2/9'3 W 1 = 0. W 1 , in.-lb.
= 0. x 14,900 x 93 = 170,800 in.-lb.
d = ' 6 x 170,800/1,200 x 8 = 10.3 or 10 in.
Therefore, an 8- x 10-in. post will be required for the conditions necessitating the 8- x 12-in. cap.
Force acting on spreader
The force acting here is represented by 2/3 W, pounds.
P = 2/3 W = 2/3 x 14,900 = 9,933 1b.
From Table 2, the allowable stress perpendicular to the grain for the material under consideration is 310 lb. per sq. in. This value is conservative.
Area for end of spreader = 9,933/310 = 32 sq. in.
For the 8- x 12-in. cap,
32/8 = 4 in.
A spreader 3- or 4-in. thick would suffice.
Suggested Change in Working Stress
The cap and posts in the preceding discussion were selected by methods using conventional working stresses for the material; these values were originally selected for use in designing various surface structures.
The allowable working stresses given in Table 2 include ample factors of safety and are used in designing structures which involve public safety and which must have a long life. These safety factors, which have been adopted after intensive investigation and observation, are for their purpose time proved.
Choice of members for underground supports should be approached with an entirely different philosophy, however. Working stresses may more closely approach the ultimate stress (see also discussion for concrete support). Because
- public safety is not involved;
- compared to surface structures, the operating life of mine supports is relatively short (as little as a few months);
- excepting the maximum effect resulting from rock bursts, the instantaneous and complete failure of the support with extensive closure of the opening is unlikely;
- timber readily indicates an increasing load (physical appearance), which provides ample time for installing additional support (installing sets between those first erected or strengthening original support);
- settling or disturbance of supports because of failure of the component parts, will be local in character'confined to only a few sets at the most, and after effects should not be compared to those of surface structure failures;
- the anticipated effective life of the opening must be carefully considered.
Data in the Wood Handbook (, p. 50-53) suggests that the strength of green or wet timber (depending on the species) is 50 to 60 percent of the dry strength. Usually only the prospector will use freshly cut and unseasoned timber. Larger operations provide ample time for considerable seasoning even though the timber may have been treated. In the event that green or wet material must be used, a lower percentage of the ultimate strength should probably be used. . The amount of correction will depend upon the time elapsing between the support's installation and its maximum loading. During this period, the ventilating air current will produce a drying effect with a resulting increase in strength.
Under these conditions a working stress of at least 50 percent of the ultimate strength could be used, which would result in a substantial saving in timber costs.
If this recommendation were followed, the timber set previously designed would be altered to the following dimensions.
Working stress = 50 percent of 6,300 = 3, 150 lb. per sq. in. = s.
Compression perpendicular to the grain = 50 percent of 820 = 410 lb. per sq. in.
Compression parallel to the grain = 50 percent of 6,100 = 3,050 or 3,000 lb. per sq. in.
Column formula, P/A = 3,000 (1 ' L/60d), lb. per sq. in.
Cap, 6 in. x 10 in.
Post, 6 in. x 8 in.
Spreader, 6 in. x 4 in.
If a 3-piece steel set, consisting of a horizontal cap and posts is used, it should be selected on the basis of a larger percentage of the ultimate strength. Instead of the commonly used value of s = 20,000 lb. per sq. in., at least the yield point is suggested. For the ordinary grade of structural steel, this point may be taken at 33,000 lb. per sq. in. As with the timber design, a straight-line column formula is satisfactory. However, the constant k in the formula must be changed to accommodate the 33,000-lb. value used for steel (Boyd, , p. 252),
When thus corrected the formula becomes,
P/A = 33,000 ' 180 1/r lb. per sq. in.
where,
P = load, lb.
A = area of cross section, sq. in.
l = unsupported length of column (post), in.
r = least radius of gyration for the steel section used, in. (obtained from a steel handbook).
Later, under Concrete Sets, a parallel discussion is offered for using ultimate strength design for concrete.
For bending stresses, the convenient formula when using steel is,
M = s I/c, in. lb.
where,
M = bending moment/ in.-lb. (MA, Mg and so on as previously explained).
s = working stress in steel, lb. per sq. in. = yield point = 33/000 lb. per sq. in.
I = moment of inertia, in. (This is obtained from a steel handbook. It is usually the value associated with the x-x axis).
c = one-half of the depth, in. (from steel handbook).
Treatment Of Timber
With few exceptions, humid conditions underground promote decay. Treatment of mine timber helps to slow down or prevent decay. Timber from which the bark is removed has a longer life than the unpeeled variety.
Treated timber may be obtained from local treating companies, or raw timber may be treated by the mine operator. Undoubtedly the former source is superior, for the commercial plant will usually be better equipped.
If mine timber (it should be framed before treatment) is not available from a commercial treatment plant, the following precautions should be observed if a company undertakes to treat its timber. Also the manufacturer of timber-preserving chemicals should be consulted.
Dipping procedure:
- Use a rectangular, welded steel tank 4 ft. x 4 ft. x 16 ft.
- Timber is best treated when either green or wet.
- Treat between 24-56 hours ' the longer the better.
- Stack treated timber so that circulation of air is retarded, to prevent rapid drying or seasoning.
The pressure-vacuum process is much superior to dipping or soaking in a tank. Ordinarily, only the well-established commercial company can afford this equipment. If the treated surface must be sawed or chopped when it is placed underground, the freshly exposed wood should be well painted with preserving solution.
Care must be used in handling and transporting treated timber to avoid excessive rupture of the treated surface.
Generally the economy of using treated timber is unquestionable, especially when the installation is to be semipermanent or permanent. In many stopes and their accessory workings (drifts, raises), long life is not necessary, however. Treatment there could be completely wasted. The life of the timber and the life of the workings must be carefully coordinated.
Framing Of Timber
Nearly all mine timber requires more or less framing. Framing means cutting to size, notching, cutting daps, mortising for joints, removing slabs from round timber or any other application of a saw or ax or other work on the timber. If the drilling and blasting operation is properly planned, a minimum of subsequent underground framing will be necessary. When treated timber must be altered before installing, the freshly exposed surface should be painted with preservative.
Equipment for timber-framing is available in great variety. Machines have been designed for cutting square-set joints and other complicated work. For the small operator, and possibly even for the larger mines, hand tools are recommended. Small hand-held chainsaws, circular saws, drills, etc. are adaptable for framing. These tools may be operated by either compressed air or electricity.
A timber shop should have a swing-saw for end-cutting and a permanently mounted power-saw for making wedges (special machines are available for making wedges). Additional equipment for squaring logs and cutting planks for lagging and blocking will usually be necessary.
Before equipping a timber-framing shop, one should consult a manufacturer of sawmill equipment.
A great deal of a timberman's time underground may be saved if a plentiful supply of 2- to 4-in. thick short planks 12 to 18 in. long are cut and packaged on the surface.
Installation Of Timber
A few remarks about the erection of timber sets may be of interest to the less experienced operator.
In addition to a pick and shovel, the customary tools required by a timberman and helper are a single-bitted, 4-lb. timberman's ax and a timberman's saw (3 to 5 ft. with deep teeth). A plentiful supply of 40d and 60d spikes is also needed.
Before starting the erection of a set, whether drift, raise, stope, or other type, the various pieces of timber required should be gathered and placed conveniently at hand. Particular attention should be paid to having a plentiful supply of wedges and blocking. Interrupting operations to rustle up a wedge has resulted in the premature collapse of many an incompletely blocked set.
Figures 8, 9, and 10 offer several suggestions for erecting drift sets. If staging must be used to place the cap and top lagging, it should be securely constructed. Two men and a wet cap may well exceed 700 lb. total weight on the staging.
Blocking of sets will be treated under TIMBER REPAIRING.
Timber Repairing
All of the timber sets to be discussed are protected against over-stressing with blocking between the set and the wall rock. Therefore, blocking serves an additional important purpose other than simply holding the member in place.
Blocking is (or should be) designed to fail before the cap, post, or other member is crushed. When the blocking has been squeezed to final deformation (see Fig. 5b and 5c), new blocking should immediately replace the old blocking before failure of the member results. In some unusual cases, failure is so rapid that replacement cannot be made in time.
Substituting fresh blocking for the deformed material is more readily accomplished before total failure takes place, and is more economical. Why wait until the cap and post, or both, must also be replaced when blocking was especially used for their protection? Not only may replacing of the set be extremely difficult, but in addition, it may be impossible to relocate the cap in its former position. Headroom and sometimes width is lost.
A 'no exception' rule should be established: deformed blocking is immediately replaced before failure of the main members begins.
Enough blocking should be used so that the protected member is sufficiently cushioned to prevent its failure from the effect of ground pressure. The thickness of blocking should probably be not less than 12 in. It should consist of several pieces of blocks, planks, and wedges; this construction absorbs the pressure best. An exception to this structure is blocking used primarily to hold the set in place instead of to resist ground movement. As noted in Figures 2 and 4b, the blocking should never be placed so that the grain of the blocking is parallel to the force. Timber is 4 to 5 times stronger when force is exerted parallel to the grain than when it is exerted perpendicular to the grain.
Blocking between the top of a cap and the rock surface will have the grain in the blocking running similar to that in the cap. Here the area of the blocking could be somewhat reduced if it is to fail before squeezing the cap or causing the post to penetrate the bottom of the cap.
Discussion Of Illustrations
Many of the figures require little explanation other than that included on the drawing. For several of the illustrations a few additional remarks are appropriate.
Simple Drift Supports
(Figure 1)
Part (b) of Figure 1 has three advantages as an alternative location for the drifts (1) support of the back may not then be necessary; (2) when mining starts, the need for floor and back pillars will be eliminated and ore will not be tied up; and (3) sloping will interfere less with other operations through the drift. The location at (b) has one drawback for the prospector: his drift is not in the vein (Staley, , p. 47). Additional crosscutting to the vein is therefore necessary at intervals, which means additional expense and loss of time, items of great importance to the prospector and miner with limited means.
Note that the angle of underlie requires a stull of greater length than the perpendicular distance between the hanging wall and the footwall. Thus, the tendency of the stull is to tighten as the load increases.
Headboards
(Figures 3, 4a, 5a, to 5d, and 7b)
Two types of headboards for stulls or caps, shown in Figure 3, have been widely applied in many of the mines of the Coeur d'Alene district in northern Idaho. Figure 3a is generally used only on drift caps and 3b on the stope-set cap.
A squeeze heading, shown in 3a, has a definite purpose. As the wall pressure increases, the headboards making up the box-like structure gradually collapse to form a solid mass of crushed timber (Figure 5b and 5c). When the condition shown in 5b is reached'all members of the heading into tight contact with each other'the deformed headings (both ends of the cap) should be removed and replaced with new headings and blocking. If these are not replaced, the cap will ultimately be destroyed. Failure of the cap usually occurs as shown in 5c; but it may occur as in 5d. Breaking of the cap as shown in 5d may also result from a too heavy load on top of the cap (to prevent this failure, relieve the pressure by removing broken rock from above the top lagging).
The inventor of the squeeze heading is unknown. Its purpose and the thought back of it deserve much credit. But for some inexplicable reason its advantage is very seldom utilized. Instead, caps are allowed to fail and the terrific job of installing a new cap is undertaken. It would be much easier and much less costly to replace the headings as soon as the situation indicated in Figure 5b is reached.
In practice, drift caps used with squeeze headings approach 15-16 inches in diameter and about 8-10 feet in length.
Caps in the stopes (a method incorrectly classified as square-set mining, but more correctly known as stull and fill) do not need squeeze headings; plain headings as shown in Figure 3b are sufficient. Depending on the thickness of the vein, these caps may approach 16 ft. in length; their diameters are 16-18 inches. Occasionally, very short pieces of stulls (butt-blocks) are used beyond the ends of the cap to reach extra wide walls or to reduce the amount of heading and blocking.
Timber sets shown in Figures 4a and 7b are semi framed. The caps are peeled logs with squared ends and a slab removed from top and bottom (or sawed timber may be used). For drift sets, posts about 8-in. or material of larger diameter is used. In the stopes, material of about the same diameter, sawed lengthwise into two halves, is sufficient. If heavy top pressure is anticipated, posts of larger diameter are required.
Squeeze Sets
(Figure 7)
Illustration 7a shows a completely framed assembly. The purpose of the pony set is twofold; (1) it provides a safe walkway and operating space for the chute puller to load cars; and (2) it provides a squeeze set to protect the main drift set if the overhead load becomes heavy. In the event this latter condition is expected, the size of the pony-set timbers should be one standard size smaller than those of the main drift set.
Figure 7b shows the squeeze set when unframed timbering is used. The purpose of squeeze sets is to insure operating access to the drift. Therefore, when the squeeze sets have collapsed to the point where destruction of the drift set is imminent, the debris resulting from the destruction of the squeeze set should be removed and a new set installed.
Erection Of Drift Sets
(Figures 8, 9, And 10)
Note the use of wedges to help support the staging as a safety precaution.
Two heavy men and a heavy cap might cause failure of the staging. Several of the Figures illustrate other applications of wedges.
Chute Construction
(Figure 11) (Figure 26m)
Figure 11 offers suggestions for selecting and designing chute detail. Chutes (c) and (d) are used in drifts where ground-support timbering is unnecessary. Usually it is possible to support the main weight of the broken ore column on solid rock rather than on the wooden chute bottom. This procedure should be considered when designing a chute. Later salvaging of usable parts should also be considered in chute design. Figure 26m offers a method for attaching the wooden chute members to a concrete post. Instead of the bolting shown there, one of the available adhesive materials may be used for attaching the wood to the concrete.
Shaft Bearing Sets
(Figure 12)
Shaft bearing sets are recommended at about 100-ft. intervals. They are used to support regular sets through the medium of the hanging bolts in the event that the blocking becomes loose. Either end-plate bearing or wall-plate bearing may be used.
Cribbing
(Figure 17)
In heavy or squeezing ground the blocking shown in Figure 17g may be replaced by or supplemented with cedar lagging, 6-in. to 8-in. diameter by 5-ft. long, split to give 4 to 6 triangular-shaped pieces. This lagging is firmly packed between the cribbing and the rock walls. Ground movement is taken up by compressing the cedar.
Application Of Stulls
(Figure 18)
Figure 18d suggests a means of catching up a caved area following the failure of the supporting timber. Situations of this sort are best prevented at the start. Usually only about one car load of rock drops out at first. This rock is cleaned up but nothing is immediately done about catching up the back. Eventually a large cave develops which is difficult to fill, and subsequent caving of the back is hard to stop. Immediate corrective action at the start usually would have prevented further enlargement of the caved area. The extension of caving ground or the displacement of timber support may be greatly reduced if corrective measures are taken promptly.
Loose Or Squeezing Ground
(Figure 19)
Fault zones, squeezing ground, and similar conditions are frequently impossible to penetrate and hold by ordinary supporting procedure. This figure explains and shows how spiling may be used. Spiling is driven with a maul or sledge, or sometimes by a heavy block swung from a rope. To protect the end of the spiling, a temporary iron shoe is often provided to cap the timber during driving. When the job is completed, projecting ends are sawed off.
Shafts have been sunk through loose ground by first freezing the site. For a description of the technique, Peele (3rd Ed., , sec. 8, p. 20) may be consulted. A similar procedure could be used for driving drifts through loose, wet ground.
Recently (Pynnonen and Look, ; Eng. and Min. Jour., Nov. , p. 126; Sun and Purcell, , p. 1), a method known as chemical injection has been devised for treating and stabilizing loose ground. This process appears to have considerable merit.
Vertical And Inclined Shafts
(Figures 20 and 21)
Little need be added to the information given with the drawings so far as the illustrations are concerned. Ground pressure for the first few hundred feet of a shaft is seldom important. Sets'either timber, steel, or concrete rings'are installed to divide the cross section into compartments; to provide a means of installing cage or skip guides; and to prevent rock from loosening and falling into the shaft. The spacing between sets is usually 5 ft. center to center.
Dimensions of the members will depend on the ground condition. For relatively shallow mines, dimensions about 8- x 8-in. would be satisfactory; with increasing ground pressure, 12- x 12-in. or larger may be required. Under exceptionally bad conditions, a 'squeeze set' may have to be installed between the main set and the rock surface. A squeeze set consists of wall plates and end plates separated from the main set by blocking which will collapse before excessive damage results to the main set.
The practice of salvaging the hanging bolts after timbering is completed is of doubtful merit. If the blocking loosens, sets may drop out with serious consequences.
Figures 20 and 21 illustrate the design for a small tonnage operation. If the shaft is sunk with only two compartments, one would be used for the cage and car. A manway would be placed in the remaining compartment. Ladders in the manway should not exceed 20 ft. in length, be inclined, and each section start from the opposite end of a platform (Mining Laws, , par. 47-405, p. 39). For economical hoisting a counterweight should be installed in the manway compartment (Staley, , p. 305). Contrary to general belief this installation is neither difficult nor costly.
If a three-compartment shaft is sunk, two compartments will be available for hoisting and the-third for the manway. For less than 300-500 tons per day, an operation in partial balance should be used (this is loosely spoken of as balanced hoisting). Or, if a greater tonnage is feasible, one of two arrangements is commonly used: (1) a cage with a skip suspended beneath it, or (2) a skip-cage changing arrangement. At least one cage should be continually available. For a three-compartment shaft the first arrangement is probably the better.
For the inclined shaft the arrangement of the ladders will depend on the inclination of the shaft. Up to about 45 degrees, platform interruptions are not too necessary.
At steeper inclinations there should be frequent interruptions in a continuous ladder.
Hoisting through an inclined shaft is accomplished by having the skip or man- car mounted on wheels running on steel rails.
For the design of safety devices or dogs see Staley (, p. 250).
Square-Set Timbering
(Figure 22)
As indicated in Figure 22, square-sets are designed for either post loading or cap loading. If the ground load is acting at an angle so that components of the load exert heavy pressure on both the cap and the post, then a more complex set may be required.
A more advanced discussion on this subject should be consulted (Peele, , sec. 10, p. 213-218; Gardner and Vanderburg, ).
https://www.911metallurgist.com/timber-support-underground-mining/
The company is the world’s best Bolt Pull Test supplier. We are your one-stop shop for all needs. Our staff are highly-specialized and will help you find the product you need.
If you are interested in sending in a Guest Blogger Submission,welcome to write for us!
Comments
0